Keystone Oil Pipeline Set to Resume Operations by April 15
The Keystone oil pipeline, which was shut last week after a leak, is expected to resume service by Tuesday, April 15, or at least this is the targeted start date announced by pipeline operator South Bow. The Keystone pipeline, with a capacity to carry more than 600,000 barrels per day (bpd) of oil
...Далее